Finishing Touches

FINAL STEPS

By now you’ve installed all parts but the DIY500 mkII side panels and knob. We will use these parts in the following procedures, before powering on and testing our completed preamp.

Fig. 101

Fig. 101 Locate the (8) flat undercut 4-40 screws from your DIY500 mkII Minimal Kit hardware bag. Use them to attach the side panels as shown.

 

Fig. 102

Fig. 102 A side view shows how the side panels wrap around to form the module enclosure.

Fig. 103

Fig. 103 With the bottom side panel installed, the module is half covered.

Fig. 104

Fig. 104 The second identical side panel is installed on top for full coverage.

Fig. 105

Fig. 105 Space is left for ventilation.

Fig. 106

Fig. 106 The edge connector is left accessible.

Fig. 107

Fig. 107 Use a 1/16" hex wrench (aka allen key) to tighten the control knob over the gain pot shaft.

Fig. 108

Fig. 108 The knob should rotate 300˚ without scraping against the front panel.

Fig. 109

Fig. 109 Congratulations! Your module is complete.

Fig. 110

Fig. 110 Lookin' good.

 

Fig. 111

Fig. 111 Install your module in a 500 Series enclosure for testing. Note the neighboring DIY500 mkII module has been redecorated. There are many ways to do this, which we may explore in a future tutorial.

Fig. 112

Fig. 112 Using a Purple Audio CANS headphone amp and Shure SM57 microphone, our preamp sounds OK!

FIN

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s